Polyester Geocomposite Geogrid Stitched with Geotextile for Asphalt Road Construction, Asphalt Layer Reinforcement, Asphalt Pavement Reinforcement.

Polyester Geocomposite Geogrid Stitched with Geotextile for Asphalt Road Construction, Asphalt Layer Reinforcement, Asphalt Pavement Reinforcement.

PP Biaxial Geogrids lies mainly in confining soil and increasing its shearing resistance by a process of interlocking between the square ribs and the soil.
Chat Now

Product Details

After years of continuous efforts, we have established a good reputation in the field of Geocell For Unpaved Roads, Geocell For Railway Subgrade Stabilization, geotextile installation. As always, we will use our mature experience to provide more customers with better products and services. 'Control the quality by the details, show the power by quality'. We have developed a complete service plan from pre-sales consultation to installation and after-sales. We insist on taking the path of professionalism. We take 'in-depth understanding of customer wishes, constantly meet customer needs' as our service tenet to ensure the safe and stable development of the enterprise and the realization of customer benefits to the greatest extent.

Biaxial Geogrids,made in Polypropylene(PP)with their square apertures,high tensile strength and optimised geometry of nodes and ribs make them equal to any other similar material. PP Biaxial Geogrids lies mainly in confining soil and increasing its shearing resistance by a process of interlocking between the square ribs and the soil.The load dispersal effect from the interlocking mechanism is highly effective and can reduce sub-base thickness and construction cost.

 

Geogrid for Subbase of Road Construction method:

(1) Clearing the surface

Remove weeds, trees and other debris harmful to the stability of the embankment within the scope of the subgrade. For the surface ponding or pond section, the water shall be drained first, the silt shall be removed, and the qualified earthwork shall be used for backfilling and compaction.

 

(2) Compaction of original surface

The site shall be leveled and the original surface shall be compacted with impact roller. The specific compaction scheme shall be implemented according to the construction scheme of subgrade impact rolling.

 

(3) Geogrid laying in the bottom layer

The geogrid is laid in full width within the scope of subgrade. Bamboo piles (or wooden piles) are used to mark the scope of geogrid laying, and then laying. The layer of geogrid shall be flat and straight; the width of both sides shall be the same as that of subgrade. There shall be no hard protrusions such as flake stones. The joint method is adopted for connection, and the two adjacent geogrids are jointed with interwoven high-strength polypropylene tape; or lap joint method is adopted, with the lap width not less than 20cm and fixed with "U" shaped nails.

 

(4) Earthwork filling

After the geogrid is laid, fill the subgrade. In order to avoid certain damage to the geogrid caused by rolling or turning around of transport vehicles, the method of rolling filling can be used for earthwork filling. The thickness of earthwork filling shall be based on the maximum loose paving thickness of soil: the earthwork embankment shall not exceed 30cm, and the rockfill embankment shall not exceed 50cm. Bulldozer leveling, roller rolling, earth filling and rolling shall meet the requirements of Subgrade Earthwork compaction specification.

 

(5) Laying of upper geogrid

After the earthwork filling and rolling is qualified, the upper layer geogrid shall be laid. The laying requirements and connection methods are the same as those of the bottom layer, but the width shall be consistent with the top width of the filling layer.

 

(6) Filling earthwork

After the upper geogrid is laid, another layer of soil shall be filled on it as soon as possible to prevent it from being damaged or lost. The earthwork of this layer shall be filled in strict accordance with the filling thickness and rolling requirements of Subgrade Earthwork, and the loose paving thickness shall not exceed 30cm. The construction technology and construction method shall be carried out according to the subgrade earthwork filling scheme.

     
              Biaxial Geogrids              uniaxial-geogrid-enviro-slope-reinforcement26305253783

Based on the concept of innovation, our company has the ability to design and develop Polyester Geocomposite Geogrid Stitched with Geotextile for Asphalt Road Construction, Asphalt Layer Reinforcement, Asphalt Pavement Reinforcement. products and micro-innovation by virtue of meticulous production technology, perfect management mode and quality management system. We strive to be strong to promote the development of the industry and the progress of society and contribute our due strength based on the local, facing the world. Our company has a strong alliance and seeks strategic partners from all over the world, so that we can realize the brilliant future together!
Hot Tags: China geogrid for subbase of road construction manufacturers, geogrid for subbase of road construction suppliers, geogrid for subbase of road construction factory, solution, quotation, Geocell Log Yard Stabilization, Uniaxial Geogrid For Retaining Wall Reinforcement, Nonwoven Geotextilel for vegetation on slope stability, Geocell For Reclaimed Asphalt, geotextile fabric, erosion control geocell

Inquiry

You Might Also Like